Terms and conditions

 

Home
Bathroom Яenovations
Home Яenovations
Canvas blinds
Underfloor Heating
Stainless Steel Balustrades
Gallery
Яeferences
Contact Us
Useful Links

"Bathroom renovations Edenvale"
Total home renovations Edenvale,
Total home renovations Pretoria,
Building alterations Sandton,
Irrigation Sandton sprinklers,
Builders Sandton,
"Bathroom renovations Boksburg"
"Bathroom renovations Bronkhorstspruit"
"Bathroom renovations Centurion"
"Bathroom renovations Garsfontein"
"Bathroom renovations Halfway House"
"Bathroom renovations Midrand"
"Bathroom renovations Pretoria"
"Bathroom renovations Pretoria North"
"Building alterations Bedfordview"
Irrigation Bedfordview sprinklers"
Builders Boksburg,
fung shui,
zen gardens,
Handyman,
Custom made,
Loodgietery,
Badkamer hernuwings,
Gebou instandhouding,
Verbouwerk,
Besproeiings stelsels,
Waterdigting,
Verf werk,
Kombuis kaste,
Landscaping,

 

The United Services Lodge

 


Terms and conditions

 Please note:

  • That by paying a deposit of any amount you bind yourself to these terms and conditions…

  • That these terms and conditions must be read in conjunction with your quotations/estimates...

  • That these terms and conditions also apply to all the additional work that may arise... as in some instances the quotes for the additional work will be send by email or even verbal (telephonic) and not necessary on an official Streamline letter head...

  • Deposits made will not be refunded on cancellations from your side, as we work on bookings...

  • Streamline Renovations reserves ownership of all material until full and final payment is received...

  • Streamline Renovations reserves ownership of all removed and /or redundant materials relating to this work...

  • A minimum of 60%deposit is required before works commences 20% on halfway mark and balance on completion...

  • That depending on the amount of material supplied by us, (the contractor)... the deposit will change accordingly so as the progress payments...

  • under no circumstances will we accept cheques or cheque deposits that take days to clear, should you deposit such a cheque... we will be entitled to stop all work until such time that the monies have been released and charge you for the inconvenience and the number of days/time wasted

  • Work will commence on the date discussed, after funds have been cleared by our bank.

  • That it is your responsibility to print this page, of future reference... as this page is subjected to change, due to updates to this site...

Extra work:

  • All additional work… is any work that is not specified on the original quotation… to have this work done the client must specify in writing (email will suffice)… and request a quotation…

  • The payment must be made in full on accepting the quote & before the work commences…

  • Extra work will include work that has to be redone due to change of mind by client… or due to material supplied by client that is not compatible…

  • All extra work that is not quoted for will be charged at a rate between R 180.00 and R 280.00 per hour depending on the amount of manpower used at the time... these rates are labour only and excludes overtime, materials and transport costs

 Delays:

  • As the client has to supply material from time to time…They must make sure that all the material is on site before we start… as any delays and time wasted due to their latency will be charged for and costs will be for the clients account…

  • Time wasted due to access restrictions to the client’s property will be for the clients account…

  • Should you deposit a cheque that has an incubation period, as progress payment... you will be charged for the time we are idle until the funds have been released... as we will stop all work, until such time that the funds have been released...

Power points and ablutions for labourers:

  • It is the client’s responsibility to supply a dedicated Power point for the duration of the contract…

  • Toilet and washing facilities are to be made available by the client…

Accidental breakages and damage to the client’s property:

  • Under no circumstance at all shall we “the contractors” be held liable for any accidental breakages and damages to any property (new or existing) belonging to the client or any third party… this includes movable, immovable, any thing related and not related to this contract… including vehicles…

  • It is the client’s responsibility to move and or cover ALL property that may be damaged…

  • The client may under no circumstance with hold or deduct funds from any of the monies due to the contractor...

Access to the client’s property:

  • The client will provide a set of keys and a remote control for the contractor to access the property, as to perform the relevant work…

Corporate ablutions & toilet facilities
Commercial toilets & bathrooms
Industrial ablutions
Domestic bathrooms
Exclusive Bathrooms

Home Bathroom Яenovations Home Яenovations Canvas blinds Underfloor Heating Stainless Steel Balustrades Gallery Яeferences Contact Us Useful Links 

Wisdom comes with years of experience
hit counter
website design company guide
Send mail to infoagp@agp.co.za with questions or comments about this web site.
Copyright © 2008 Anthony G promotions